Install a power socket
A new single or double socket on an existing circuit, chased in, made good and tested.
Ziad Mansour
Electrician
4.7
(340)
- 8 JOD
- Starting at
- 30 min
- Typical visit
- ~24 min
- Usually replies
Recent work
Reviews
-
Tariq M.
Quote came back with photos of what was actually wrong. First time anyone has done that.
last month
-
Rana K.
Arrived inside the hour on a Friday night. I was not expecting anyone before Sunday.
3 weeks ago